tolco 4inch pipe clamp for seismic longitudinal bracing

AF775 Longitudinal & Lateral Seismic Clamp ASC

Position the clamp at the desired location on the service pipe and hand tighten the hex bolts. Ensure the spacer and the brace socket attachment are positioned on the bolt between the pipe clamps ears. Insert brace pipe into the socket until the brace pipe bottoms out. Torque shear off Fig. 4A - Pipe Clamp for Sway Bracingtolco 26 tolco Revision 9/1/2006 Fig. 4A - Pipe Clamp for Sway Bracing Size Range 4" thru 8" pipe. For sizes smaller than 4" use TOLCO® Fig. 4. Material Carbon Steel Function For bracing pipe against sway and seismic disturbance. Approvals Underwriters Laboratories Listed in the USA (UL) and Canada (cUL) 4" thru 8".

Fig. 4B - Pipe Clamp for Sway Bracing

Order By Figure number, pipe size and finish. Installation Instructions The Fig. 4B is the "braced pipe" attachment component of a longitudinal or lateral sway brace assembly. It is intended to be combined with the "bracing pipe" and TOLCO transitional and structural attachment component(s) to form a complete bracing assembly. Fig. 4L Longitudinal In-Line Sway Brace Attachmentcombined with the "bracing pipe" and TOLCO structural attachment component to form a complete bracing assembly. NFPA 13 and/or OSHPD guidelines should be followed. To Install Place the Fig. 4L over the pipe to be braced and tighten bolts. Then engage "bracing pipe" into jaw opening and tighten set bolt until hex head snaps off. Fire Protection Support Systems - Viking Group IncDec 06, 2007 · Standard Pipe Clamp MSS-SP-69, Type 4 WW-H-171E, Type 4 Page 12 Fig. 4A Pipe Clamp for Sway Bracing Page 13 Fig. 4F Standard Pipe Clamp with Felt Lining MSS-SP-69, Type 4 WW-H-171E, Type 4 Page 12 Fig. 4PVC PVC Coated Pipe Clamp Page 12 Fig. 4B Seismic Pipe Clamp Page 14 Fig. 75 Swivel Page 32

Longitudinal Seismic Bracing Options for CPVC?

May 31, 2019 · Manufactures of engineered composite joists do have seismic details on how to attach the swivel attachment (knuckle). Typically a Tolco fig.909 with an Afcon AF035 Model K fast clamp and 1" steel schedule 40 pipe Trusses can be quite different and must consult the architectural engineer. Pipe Hangers & Supports Seismic Bracing NEFCOCable/Conduit Clips & Clamps; Cadweld; Ceiling/Acoustical/Datacom; Jack Chain; Pre Tied Pin & Clip Assemblies; Stud Wall; Rod Lock (Caddy) Underground Cable Racking; Underground Duct/Conduit Supports; Wire & Cable Management; Cable Tray; Misc. Electrical; Show All Electrical; Firestop. Firestop Cast-In Devices, Sleeves, & Collars; Firestop Seismic Bracing - Eaton B-Line - Free 3D CAD ModelsFig. 4B - Pipe Clamp for Sway Bracing (Cooper B-Line B386) - Pipe Clamp for 12.11.2020 Fig. 4L - Longitudinal "In-Line" Sway Brace Attachment - Longitudinal In-Li

Seismic Bracing Archives - PHD Manufacturing

Sway Brace Pipe Attachment. Figure:010 Function. Designed for bracing pipe against sway and seismic disturbance. The pipe attachment component of a sway brace system used in conjunction with a PHD Manufacturing structural attachment fitting, and joined together with a bracing pipe element forms a complete sway brace assembly. Seismic Bracing Systems - Unistrut Service Company8. Check forces on pipe clamps using following equations:Vertical Force = Pipe Wt. per foot x Trapeze spacing Transverse Force = Pipe Wt. per foot x Lateral Brace Spacing x 0.5 Longitudinal Force = Pipe Wt. per foot x Longitudinal Brace Spacing x 0.5 See pages 3-3 and 3-4 for allowable design forces. Revise spacing of braces if necessary. 9. anvil 775 - National FireService:Used to rigidly brace piping systems subjected to sway and seismic disturbances. Pipe clamp component of Anvil's 700 series sway brace assembly. Can be utilized as either a lateral brace clamp or a longitudinal brace clamp. Approvals:UL and ULC Listed (UL 203A:2009), and FM Approved (FM 1950:2010). Complies with seismic bracing

TOLCO Seismic Bracing

To Install:Place the Fig. 4LA pipe clamp component over the pipe to be braced and tighten down the break-off nuts until the hex head portion breaks off to verify correct installation torque. Next engage brace member (pipe or strut) with jaw component and tighten break-off head bolt until the hex head breaks off to verify correct installation torque.